1959 : REEL’s “Jumbo” dig the Mont-Blanc tunnel

50 years ago  : 1959 – The « Jumbo » of REEL dig the Mont-Blanc tunnel.

Ordered by BORIE SA, designed and manufactured by REEL, the Jumbo is a 75 tons machine, 9 meters high, 8 meters wide and 20 et 20 of length.

It carries 16 air drills and 25 employees.

The 140 holes made at each station are then loaded with explosives and the rock is emptied by wagons …

The average advance of 8 meters  per day, thanks to the Jumbo, allows the French to finish before the Italians on the 14th of August 1962 …

The breakthrough of the Mont-Blanc: A wild race between the French and the Italians !

 

Join a dynamic group! we are always on the lookout for new talents!
Reel hire all over the world

REEL wishes you a happy new year 2023

REEL wishes you a happy new year 2023!

Groupe REEL takes over CNIM Systèmes Industriels

Groupe REEL takes over CNIM Systèmes Industriels, which designs and produces large-scale complex mechanical systems.

Aluminium Exhibition – Come and meet us!

REEL teams are waiting for you from 27th to 29th September 2022 at the 2022 Aluminium Exhibition in Düsseldorf.

REEL at the 2022 SOLIDS Dortmund exhibition – Come and meet us!

Our teams are waiting for you 22 to 23 of June at the Dortmund exhibition center!